COMMERCIAL PACKAGES
STANDARD | STANDARD PLUS | PREMIUM | ||
---|---|---|---|---|
SL | Name of Materials | Rate per sft 1199 | Rate per sft 1299 | Rate per sft 1399 |
1 | Cement | PENNA, Birla SHAKTHI, cormandala | PENNA, Birla SHAKTHI, cormandala | Ultratech, ZUARI |
2 | Steel | Gopal , Sunvik , Meenakshi | ARS, A1 GOLD, Kamdhenu | Prime Gold/ Indus/SK TMT |
3 | Wall | 6" and 4" Blocks | 6" and 4" Blocks | 8", 6" and 4" Blocks |
4 | Sand | M sand | M sand | M sand |
5 | Plastering Sand | P sand | P sand | P sand |
6 | Aggregate 20mm/12.5mm | Crushed stone | Crushed stone | Crushed stone |
7 | Windows (Aluminum) | Aluminum 2 track with 4mm glass Rs180/sft | Aluminum 2 track with 4mm glass Rs 220/sft | Aluminum 3 track with 4mm glass Rs 300/sft |
8 | Flooring tiles | Flooring tile 40/sft | Flooring tile 50/sft | Flooring tile/Granite Rs 60/sft |
9 | Dado tiles | Bathroom tile7' ht 40/sft, kitchen 2' ht 40/sft | Bathroom tile7' ht 40/sft, kitchen 2' ht 40/sft | Bathroom tile10' ht Rs 37/sft, kitchen 2' ht Rs 37/sft |
10 | Staircase Granites | Sadaralli 65/sft | Sadaralli 80/sft | Sadaralli / Steel grey 100/sft |
11 | Staircase Railing | MS railing by using 16 guage pipes | MS railing by using 16 guage pipes | MS railing 16 guage |
12 | Window Grill | by using 10mm MS Rod | by using 10mm MS Rod | Round/Hexagonal/Square 12mm Rod |
13 | Balcony tile | Tile 32/sft | Tile 32/sft | Tile 40/sft |
15 | External Paint | Ace Exterior Emulsion | Ace Exterior Emulsion | Ace Exterior Emulsion |
16 | MS and wood Paint | Enamel , Asian | Enamel , Asian | MS & internal Shuutter Enamel , Pooja and MD Polish |
17 | Bathroom Accessories | 10000/ Bathroom | 15000/ Bathroom | 18000/ Bathroom |
18 | Plumbing Pipes and fittings | Astral / Ashirvad | Astral / Ashirvad | Astral / Ashirvad / Supreme |
19 | Over head tank ( 1000 ltr) | Ganga , Kaveri Double Layered 1000 ltrs Rs 5/ltr | Ganga , Kaveri Double Layered 1000 ltrs Rs 5/ltr | Ganga , Kaveri Triple Layered 1000 ltrs Rs6.5/ltr |
20 | Electrical Wire | Wires - Fireproof wires by Finolex | Wires - Fireproof wires by Finolex | Wires - Fireproof wires by Finolex |
21 | Electrical Switches | Switches & Sockets - Hi-Fi | Switches & Sockets - Anchor | Switches & Sockets - Anchor Roma |
22 | Waterproofing | By using Dr. Fixit | By using Dr. Fixit | By using Dr. Fixit |
23 | Under Ground Sump | 6" Block work Capasity 5000ltrs | 6" Block work Capasity 6000ltrs | 8" Block work Capasity 8000ltrs |
24 | Floor to Floor finish level | 10ft | 10ft | 10ft |
25 | Plinth height from Road level | 1.5ft | 1.5ft | 1.5ft |
26 | Chamber Cover | Stone cover | Cement cover | Cast iron Cover |
27 | Additional Work which is not included in Packages | Compound wall , External Drain work , Carpentery work (Wadrobes) , KEB Connection & Charges , Water connection & charges , External Elevation ( Glass + wall cladding ) , Sump extra 10rs per liter | ||
Note: |
Terms and conditions :
Material cost got increased by more than 5% .. Client has to pay Diff amount. Delay in work due to payment issue, clientwill be the responsible for hole and soul Client has to make the Payment as per aggrement, other wise work will be stopped without any Further intimation. After building completion, client has to pay final settelment amount within a month . If any rework happen at site after confirmation by client also. Client has to pay diff amount . If client want to Go for heigh end Product the diffrence amount to be paid before work Completion. Compound wall will be extra. Architectural & Structural drawings will not be extra. |